News

18 Scottish museums and galleries share £1.16m to tackle extreme weather

Alistair Hardaker | Image: Scalloway Museum

Grants fund roof repairs protecting Elgin’s fossil collection, new heat pumps and replacement racking for Orkney’s archaeology stores.

Museums Galleries Scotland has awarded new funding among 18 Scottish museums and galleries for urgent repairs and upgrades.

A total of £1,163,722 has been awarded via the Repair and Adaptation Fund, supported by the Scottish Government.

Recipients include Glasgow School of Art, Orkney Museum, and Elgin Museum.

Elgin Museum in Moray has received £100,000 to address urgent roof repairs on its Rear Gallery which houses its nationally significant fossil collection. It is set to re-slate its roof to stop active water leaks. It will also install 36 integrated solar panels to improve energy efficiency and reduce the site’s carbon footprint.

Historylinks Museum in Dornoch will use its grant to replace its failing solar panels with higher spec models. Scalloway Museum will upgrade its air source heat pump system.

The Tallship Glenlee will renew its water source heat pump system, which uses the River Clyde as an energy source and provides around 70% of the ship’s core heating.

Orkney Museum has been awarded £79,185 to make urgent upgrades to its collection stores by replacing damaged and unstable racking and shelving.

Siobhan Cooke-Miller, archaeology curator at Orkney Museum said the improved storage “will transform access to the collections, creating greater opportunities for curatorial staff, volunteers, researchers and the public to explore, study and engage with Orkney’s rich archaeological heritage, ensuring these important collections can be enjoyed and appreciated by a wider audience.”

Orkney Museum, Orkney © Orkney.com

Museums Galleries Scotland said an increase in extreme weather events is amplifying the need for building repairs and upgrades.

Isle of Arran Heritage Museum will use its £100,000 grant for repairs to its roof and windows to stop water ingress and improvements to insulation to reduce levels of damp, which pose an increasing risk to the museum’s exhibits. Museum Galleries Scotland said volunteers are currently forced to moved objects to drier, more stable environments.

Glasgow School of Art received £45,111 for urgent repairs and adaptations to Window on Heritage, its accredited museum space in the Reid Building. The grant will fix an uneven floor, install a weather-tight, button-operated door, and add new signage to make the currently locked street-level entrance accessible to the public.

Lucy Casot, CEO of Museums Galleries Scotland cited the organisation’s 2026 Survey of Scotland’s Museums and Galleries, conducted by DC Research. It found 52% of responding museums and galleries are unable to keep pace with routine building maintenance.

Casot said: “This funding is essential to help museums continue caring for Scotland’s collections and welcoming visitors from across the country and around the world. However, we recognise that the funding available to us falls short of the sector’s needs. We will continue to make the case for additional investment, informed by clear evidence of those needs.”